Despite
the importance of the Piraeus' harbour those years the works of modernizing
the harbour didn't go fast. The most important of these were the two permanent
dry-docks at Kremmydarou Bay, commenced in 1898 and completed in 1912.
On the other side, a new managing system
was too needed so a Port Committee began operating as an autonomous Legal
Entity, which controlled the works of construction and maintenance of the
port. Until this, it had been a municipal issue. Under this new authority
a new sector NW of the port was constructed.
Finally, in 1930 the Port of Piraeus
Authority was established to make a more efficient management of the port
that was slowly increasing its traffic. In this way, it was supposed that
the problems of the port's infrastructure were going to be solved with a unique
and strong authority. Until the entrance of Greece in the Second World War
a lot of port works were made so as to cope with the demands of traffic at
that time.